PPT Slide
Approach and Departure Procedures (continued)
- NA – 12 Standard Instrument Departures (SIDs)
- NA – 13 Standard Terminal Arrival Routes (STARs)
- NA – 14 Extension of Noise Abatement Tracks
- NA – 15 Eliminate Early Descent on Approach
Operator Procedures
- NA – 16 Distant Noise Abatement Departure Procedure
Airport Policies and Regulations
- NA – 17 Engine Run-up Restrictions
- NA – 18 Limit use of North Runway Extension to Aircraft Needing Full Runway Length & Use South Extension for Departures to the North